Advanced Specialty Contractors was contracted to insulate approximately 10,000 LF of pipe at the Hershey
Advanced Specialty Contractors was contracted to insulate 8' above finished floors and down to
Location: PA Operator: Exelon Nuclear Configuration: 1 X 926 MW, 1 X 961 MW PWR Operation: 1974-1978 Reactor
Location: NJ Operator: Exelon Nuclear Configuration: 1 X 1174 MW, 1 X 1158 MW Operation: June 30,
Location: PA Operator: Exelon Nuclear Configuration: 2 X 1,182 MW BWR Operation: 1974 Reactor supplier: GE T/G supplier: GE EPC:
Location: NJ Operator: Exelon Nuclear Configuration: 1 X 615 MW Operation: December 1, 1969 Reactor supplier: General Electric
Location: PA Operator: Exelon Nuclear Configuration: 2 X 1,231 MW BWR Operation: 1986-1990 Reactor supplier: GE T/G supplier: GE EPC:
These stationary and transportable asphalt tanks are fabricated, insulated and lagged, and shipped to